Worksheet
Coding Camp: Annotate the Progress Graphs
Interpret coding-camp progress graphs, explain the origin and unit-rate points, and evaluate project-planning claims.
Grade 7MathInteractive · Printable
Aligned to7.RP.A.2.d
What’s included
- Single worksheet
- Auto-graded online
- 1 Common Core standard
- Printable answer key
- 13 questions
- Classroom-ready
Details
- Format
- Interactive · Printable
- Grade
- Grade 7
- Subject
- Math
- Question types
- Fill in the blank, Multiple choice, Circle the answer, Short answer
About this worksheet
What students practice
- Students interpret both coordinates of points on proportional graphs in context.
- Students explain the meanings of the origin and unit-rate points using labeled axes.
- Students use proportional graph points to evaluate project-progress plans.
How to use
Have students read each graph's axis labels before answering. Use the final explanation to discuss when a proportional progress model stops applying.
Curriculum
Common Core standard covered
Explain what a point (x, y) on a proportional graph means in context, especially (0, 0) and (1, r) where r is the unit rate.
Preview
OwlSheets.com
Coding Camp: Annotate the Progress Graphs
Connect graph coordinates to project progress and unit rates.
Testing Dashboard
Use the testing graph for Questions 1–5. The camp models testing at a constant rate. Hours count active testing time only, not breaks.
6 scripts tested after 3 active testing hours3 scripts tested after 6 active testing hours3 active testing hours paired with 6 scripts tested6 scripts tested during each active testing hour
- A. U represents the total number of scripts in the project.
- B. U represents exactly one hour of active testing.
- C. U represents the first script tested during camp.
- D. U represents fewer tested scripts than W does.
What x-coordinate belongs in the alert point ( , 8)?
- A. Ten scripts have been tested, and no testing time remains.
- B. No testing time has been used, and no scripts have been written.
- C. No testing time has been used, and no scripts have been tested.
- D. Ten testing hours remain, and no scripts have been tested.
- A. It should show (0, 0), restarting the testing record.
- B. It should show (3.5, 6), counting the break as testing time.
- C. It should show (3, 6), keeping both recorded totals.
- D. It should show (3.5, 7), extending the testing model.
Module Planning
Use the module graph for Questions 6–10. It models the active work time needed to complete equal-sized coding modules at a constant rate. Partial module progress is allowed.
- A. Active work hours needed per module
- B. Active work hours remaining at camp
- C. Modules completed per active work hour
- D. Modules remaining after one work hour
Complete the point: (1, ). This y-coordinate is measured in hours.
- A. The point (1, 1.5) represents 1 module in 1.5 hours.
- B. The point (1.5, 2) represents 1.5 modules in 2 hours.
- C. The point (2, 3) represents 2 modules in 3 hours.
- D. The point (2, 1.5) represents 2 modules in 1.5 hours.
The 3 hours are paired with 4 modules, not 1 module.The time per module is 4 ÷ 3 hours.The time per module is 3 ÷ 4 hours.A labeled point cannot be used to find a unit rate.
How many active work hours does the y-coordinate represent? hours
Review the Project Notes
Read the axis meanings carefully. Use the proportional models only for the quantities they describe.
- A. The upload has sent 15 megabytes in 2.5 minutes.
- B. The upload has sent 2.5 megabytes in 15 minutes.
- C. The upload has sent 15 megabytes in each minute.
- D. The upload has sent 6 megabytes in 2.5 minutes.
- A. One debugging hour fixes 3 pages; one documentation hour finishes 3 bugs.
- B. One debugging hour fixes 3 bugs; one documentation hour finishes 3 pages.
- C. One bug takes 3 debugging hours; one page takes 3 documentation hours.
- D. Three debugging hours fix 1 bug; three documentation hours finish 1 page.
Related worksheets
WorksheetGrade 7
Garden Market: Reading Sales Graphs
Ratios & Proportional Relationships · 7.RP.A.2.d
Premium13 questions
WorksheetGrade 7
Theater Club: Sets, Seats, and Graph Notes
Ratios & Proportional Relationships · 7.RP.A.2.d
Premium13 questions
WorksheetGrade 7
Weekend Bike Repair: Reading the Graphs
Ratios & Proportional Relationships · 7.RP.A.2.d
Premium13 questions
WorksheetGrade 7
Soccer Season: Read the Points
Ratios & Proportional Relationships · 7.RP.A.2.d
Premium13 questions
WorksheetGrade 7
Tide-Pool Counts: What the Points Mean
Ratios & Proportional Relationships · 7.RP.A.2.d
Premium13 questions
WorksheetGrade 7
Skate and Climb: Membership Decisions
Ratios & Proportional Relationships · 7.RP.A.3
Premium14 questions