OwlSheets.com
Coding Camp: Annotate the Progress Graphs
Connect graph coordinates to project progress and unit rates.
Answer Key
Testing Dashboard
Use the testing graph for Questions 1–5. The camp models testing at a constant rate. Hours count active testing time only, not breaks.
6 scripts tested after 3 active testing hours3 scripts tested after 6 active testing hours3 active testing hours paired with 6 scripts tested6 scripts tested during each active testing hour
- A. U represents the total number of scripts in the project.
- B. U represents exactly one hour of active testing.
- C. U represents the first script tested during camp.
- D. U represents fewer tested scripts than W does.
What x-coordinate belongs in the alert point (4, 8)?
- A. Ten scripts have been tested, and no testing time remains.
- B. No testing time has been used, and no scripts have been written.
- C. No testing time has been used, and no scripts have been tested.
- D. Ten testing hours remain, and no scripts have been tested.
- A. It should show (0, 0), restarting the testing record.
- B. It should show (3.5, 6), counting the break as testing time.
- C. It should show (3, 6), keeping both recorded totals.
- D. It should show (3.5, 7), extending the testing model.
Module Planning
Use the module graph for Questions 6–10. It models the active work time needed to complete equal-sized coding modules at a constant rate. Partial module progress is allowed.
- A. Active work hours needed per module
- B. Active work hours remaining at camp
- C. Modules completed per active work hour
- D. Modules remaining after one work hour
Complete the point: (1, 0.75). This y-coordinate is measured in hours.
- A. The point (1, 1.5) represents 1 module in 1.5 hours.
- B. The point (1.5, 2) represents 1.5 modules in 2 hours.
- C. The point (2, 3) represents 2 modules in 3 hours.
- D. The point (2, 1.5) represents 2 modules in 1.5 hours.
The 3 hours are paired with 4 modules, not 1 module.The time per module is 4 ÷ 3 hours.The time per module is 3 ÷ 4 hours.A labeled point cannot be used to find a unit rate.
How many active work hours does the y-coordinate represent? 4.5 hours
Review the Project Notes
Read the axis meanings carefully. Use the proportional models only for the quantities they describe.
- A. The upload has sent 15 megabytes in 2.5 minutes.
- B. The upload has sent 2.5 megabytes in 15 minutes.
- C. The upload has sent 15 megabytes in each minute.
- D. The upload has sent 6 megabytes in 2.5 minutes.
- A. One debugging hour fixes 3 pages; one documentation hour finishes 3 bugs.
- B. One debugging hour fixes 3 bugs; one documentation hour finishes 3 pages.
- C. One bug takes 3 debugging hours; one page takes 3 documentation hours.
- D. Three debugging hours fix 1 bug; three documentation hours finish 1 page.
The point (1, 3) means the model predicts 3 completed features in 1 active work hour, a rate of 3 features per hour. Extending that proportional line gives (5, 15), but this project has only 12 features. All 12 are complete at (4, 12), so the same proportional completion model cannot continue past that point for this project.