A Letter from the Apartment Site
Read a construction coordinator's letter and work plan to explain specialization and dependence among workers and communities.
Preview
OwlSheets.com
A Letter from the Apartment Site
Explore how skilled workers connect their work to build homes.

Read the Letter
Read Nessa's letter to a third-grade class. For each multiple-choice question, circle one answer.
News from Flintglass
Dear Third Graders, Our crew is building an apartment building in Flintglass. I am Nessa, the site coordinator. I help arrange the work. Specialization means focusing on a particular kind of work and developing skill at it. Davin has practiced joining water pipes and finding leaks for years. Solene has trained to install and test electrical wiring. They share a tool storage room, but they completed different training.
Our windows come from a factory in Stonefen, another community. The factory workers make window frames rather than whole buildings. Our designer sends them the sizes of the window openings. An early sample frame was too wide. The designer checked the opening and sent a corrected measurement before the factory made the remaining frames. A delivery company will carry the finished windows here. Then our window installers will fit them into the building.
The Stonefen factory uses a machine-repair business in Flintglass. Its mechanics travel to Stonefen to care for the factory's cutting machines. They do not work at our apartment site. The factory uses part of the money it earns from window orders to pay its repair bills. Meanwhile, our construction crew buys the factory's windows for the new homes.
Inside the building, the wall crew has stacks of wall panels ready. Before that crew covers the pipes and wires, both Davin's pipe tests and Solene's wiring tests must be finished. Those tests can take place while we wait for the windows. I keep the work plan below on my desk and update the crews when a task is ready. Sincerely, Nessa
- A. It helped prevent the same poor fit in later frames.
- B. It let the delivery company choose the window sizes.
- C. It let the designer take over the factory's machines.
- D. It gave the installers practice cutting factory frames.
- A. Their tools belong to the factory rather than the building crew.
- B. Their work becomes the same once the wall panels arrive.
- C. Their jobs depend more on their schedules than on their training.
- D. Their different training prepares them for different skilled tasks.
The preview shows the first questions. Unlock the worksheet to see all of it.
Related worksheets

A New Way to Hear the Lighthouse Bell
Grade 3 · ECO.3.2
13 questionsFree

Tree Care Beyond the Park Gate
Grade 3 · ECO.3.2
14 questionsPremium

Keeping the School Climbing Wall Ready
Grade 3 · ECO.3.2
13 questionsPremium

Many Specialists Behind the Curtain
Grade 3 · ECO.3.2
15 questionsPremium

Crossing Work at Heron Bend
Grade 3 · ECO.3.2
15 questionsPremium

Window Boxes, Many Helpers
Grade 3 · ECO.3.2
14 questionsPremium