OwlSheets
Weekend Bike Repairs: Batch Forecasts worksheet preview

WorksheetPremium

Weekend Bike Repairs: Batch Forecasts

Interpret slopes and intercepts in bike-repair models, plan service batches, and predict weekend profit from paired data.

Grade 8MathInteractive · Printable

Aligned to8.SP.A.3

Buy this worksheet: $1.50

Or unlock every Premium worksheet with Premium

PrintUnlock to print
Answer keyUnlock to see answers
Assign to classUnlock to assign with a class code

What’s included

  • Single worksheet
  • Auto-graded online
  • 1 Common Core standard
  • Printable answer key
  • 14 questions
  • Classroom-ready

Details

Format
Interactive · Printable
Grade
Grade 8
Subject
Math
Question types
Fill in the blank, Multiple choice, Circle the answer, Short answer

About this worksheet

What students practice

  • Students interpret the slopes and intercepts of linear models with units.
  • Students use linear models from paired data to make scheduling and profit decisions.
  • Students explain how changing the input's reference point changes the meaning of the intercept.

How to use

Use after introducing fitted linear models. Have students show calculations on separate paper and discuss why model predictions can differ from records.

Curriculum

Common Core standard covered

8.SP.A.3

Use the equation of a linear model to solve problems with paired data, explaining what the slope and intercept mean.

Preview

OwlSheets.com

Name Date

Weekend Bike Repairs: Batch Forecasts

Use paired-data models to plan service batches and predict profit.

Plan Service Batches

Amara and Luis run a weekend bike-repair business. Use their fitted models for predictions, rather than assuming every recorded value lies on a model.

For batches of basic tune-ups, they recorded the number of bikes and total service time, including one setup period per batch. Their fitted model is T = 9n + 14, where n is the number of bikes and T is the predicted batch time in minutes.
Earlier Tune-Up Batches
Bikes in batchObserved time (min)
233
448
670
885
1.
They reserved exactly the model's predicted time for the recorded four-bike batch. What happened according to the table?
  • A. The batch finished 2 minutes after its reserved time.
  • B. The batch finished 12 minutes after its reserved time.
  • C. The batch finished 12 minutes before its reserved time.
  • D. The batch finished 2 minutes before its reserved time.

The preview shows the first questions. Unlock the worksheet to see all of it.

Related worksheets