OwlSheets
Summer Jobs: Time and Take-Home Pay worksheet preview

WorksheetPremium

Summer Jobs: Time and Take-Home Pay

Interpret slopes and intercepts, predict job times and earnings, and use linear models to make summer-work decisions.

Grade 8MathInteractive · Printable

Aligned to8.SP.A.3

Buy this worksheet: $1.50

Or unlock every Premium worksheet with Premium

PrintUnlock to print
Answer keyUnlock to see answers
Assign to classUnlock to assign with a class code

What’s included

  • Single worksheet
  • Auto-graded online
  • 1 Common Core standard
  • Printable answer key
  • 14 questions
  • Classroom-ready

Details

Format
Interactive · Printable
Grade
Grade 8
Subject
Math
Question types
Fill in the blank, Multiple choice, Circle the answer, Short answer

About this worksheet

What students practice

  • Students interpret slopes and intercepts in models of job time and earnings.
  • Students use linear model equations to predict values and solve planning problems.
  • Students distinguish model predictions from observed results.

How to use

Have students work through the models independently, showing substitutions on scratch paper. Discuss how each intercept affects a single job versus several jobs.

Curriculum

Common Core standard covered

8.SP.A.3

Use the equation of a linear model to solve problems with paired data, explaining what the slope and intercept mean.

Preview

OwlSheets.com

Name Date

Summer Jobs: Time and Take-Home Pay

Use linear models to plan lawn-mowing and babysitting jobs.

Plan the Mowing Time

Use the model, not individual data rows, for predictions. Treat predicted times as estimates.

Jordan records lawn area and total job time. The total includes unloading equipment, mowing, and cleanup. A linear model is T = 0.04x + 12, where x is lawn area in square meters and T is predicted total time in minutes.
Jordan's Completed Jobs
Lawn area (m²)Observed time (min)
10017
20019
30025
40027
1.
What does the slope of T = 0.04x + 12 mean?
  • A. Each additional minute allows 0.04 square meter to be mowed.
  • B. Each additional square meter adds 12 minutes to predicted time.
  • C. Each additional square meter adds 0.04 minute to predicted time.
  • D. Each additional job adds 0.04 minute to predicted time.

The preview shows the first questions. Unlock the worksheet to see all of it.

Related worksheets