Worksheet
Weekend Bike Repair: Find the Missing Rate
Solve two-step equations from a student-run bike business, interpret solutions, and compare algebraic and arithmetic methods.
Grade 7MathInteractive · Printable
Aligned to7.EE.B.4.a
What’s included
- Single worksheet
- Auto-graded online
- 1 Common Core standard
- Printable answer key
- 14 questions
- Classroom-ready
Details
- Format
- Interactive · Printable
- Grade
- Grade 7
- Subject
- Math
- Question types
- Fill in the blank, Multiple choice, Circle the answer, Short answer
About this worksheet
What students practice
- Students model and solve repair-business problems with equations of the forms px + q = r and p(x + q) = r.
- Students compare arithmetic calculations with algebraic steps and interpret solutions in context.
How to use
Have students show equation steps on separate paper. Discuss how each arithmetic operation undoes a part of the business record.
Curriculum
Common Core standard covered
Solve word problems with equations like px + q = r and p(x + q) = r, and compare the algebra with an arithmetic solution.
Preview
OwlSheets.com
Weekend Bike Repair: Find the Missing Rate
Model repair records and compare equation-solving methods.
Read the Repair Records
Imani and Theo run a weekend bike-repair business. Use each independent record to find the unknown.
| Charge | Amount ($) |
|---|---|
| Parts | 17 |
| Labor: 3 hours | 3x |
| Total | 68 |
Use 3x + 17 = 68. What is the hourly labor charge? $ per hour
- A. 6(x + 7) = 133
- B. 7(x + 6) = 133
- C. 7x = 133 + 7 × 6
- D. 7x + 6 = 133
What is the hourly labor charge? $ per hour
Use 5(x + 8) = 112.50. What is the cost of one tube? $
- A. 4x + 12 = 84; x = 84 ÷ 4 − 12
- B. 12x + 4 = 84; x = (84 − 4) ÷ 12
- C. 4x + 12 = 84; x = (84 − 12) ÷ 4
- D. 4(x + 12) = 84; x = 84 ÷ 4 − 12
Connect Arithmetic and Algebra
Pay attention to what each operation represents. A fee charged once is different from a fee charged for every repair.
162 ÷ 6 − 9(162 − 9) ÷ 6(162 − 6 × 9) ÷ 6162 ÷ (6 + 9)162 − 6 × 9
- A. It is the combined adjustment and inspection time for one bike.
- B. It is the combined inspection time for all eight bikes.
- C. It is the adjustment time without inspection for one bike.
- D. It is the combined adjustment time for all eight bikes.
In 14x + 23 = 149, what is x, the number of flat-tire repairs? repairs
- A. Calculate 62 ÷ 4 + 10.
- B. Calculate (62 − 10) ÷ 4.
- C. Calculate 62 ÷ (4 + 10).
- D. Calculate (62 + 10) ÷ 4.
After subtracting 33 from both sides, 3x = . The labor charge per wheel is $ .
Use and Check the Solutions
Build a model from each record. Interpret the unknown before making a decision.
Use 6(x + 5) = 110 − 20. How many minutes of repair work can they spend on each bike? minutes
- A. Complete 8 repairs, using (85 + 19) ÷ 13.
- B. Complete 9 repairs, using 85 ÷ 13 and adding 2.
- C. Complete 5 repairs, using (85 − 19) ÷ 13.
- D. Complete 7 repairs, using 85 ÷ 13 and rounding up.
What should the new package cost? $
Related worksheets
WorksheetGrade 7
Adoption and Supply Plans
Expressions & Equations · 7.EE.B.4.a
Premium14 questions
WorksheetGrade 7
Summer Work: Hours, Rates, and Take-Home Pay
Expressions & Equations · 7.EE.B.4.a
Premium13 questions
WorksheetGrade 7
Soccer Season: Rebuild the Records
Expressions & Equations · 7.EE.B.4.a
Premium14 questions
WorksheetGrade 7
Tide-Pool Survey: Reconstruct the Counts
Expressions & Equations · 7.EE.B.4.a
Premium13 questions
WorksheetGrade 7
Garden Club Market: Rebuild the Sales Records
Expressions & Equations · 7.EE.B.4.a
Premium14 questions
WorksheetGrade 7
Lift Lines and Snowfall: Read the Rewrites
Expressions & Equations · 7.EE.A.2
Premium14 questions