OwlSheets
Shortcut Trails at Fossil Ridge: Measuring and Fixing Erosion worksheet preview

WorksheetPremium

Shortcut Trails at Fossil Ridge: Measuring and Fixing Erosion

Grade 6 earth science: read erosion pin data from a fossil park's shortcut trails, then judge which fix reduces soil loss within the park's budget.

Grade 6ScienceInteractive · Printable

Aligned toMS-ESS3-3

Buy this worksheet: $1.50

Or unlock every Premium worksheet with Premium

PrintUnlock to print
Answer keyUnlock to see answers
Assign to classUnlock to assign with a class code

What’s included

  • Single worksheet
  • Auto-graded online
  • 1 NGSS standard
  • Printable answer key
  • 10 questions
  • Classroom-ready

Details

Format
Interactive · Printable
Grade
Grade 6
Subject
Science
Question types
Fill in the blank, Multiple choice, Matching, Short answer

About this worksheet

What students practice

  • Students analyze erosion pin and plant cover data to monitor a human impact on the land.
  • Students evaluate solutions that reduce trail erosion against criteria and a budget constraint.

How to use

Show a photo or sketch of a zigzag trail with a straight shortcut before reading, then let small groups work through the monitoring data and the design test.

Curriculum

NGSS standard covered

MS-ESS3-3

Design a way to monitor and reduce a human impact on the environment.

Preview

OwlSheets.com

Name Date

Shortcut Trails at Fossil Ridge: Measuring and Fixing Erosion

Use erosion pins and a field test to monitor and reduce damage from visitors' shortcuts.

Measuring the damage

Read the passage and Table 1, then answer the questions.

The Trouble with Shortcuts

1Ms. Yolanda Restrepo's sixth graders spent a day at Fossil Ridge State Park on a geology field trip. Visitors may collect loose fossil shells from a gravel bed at the bottom of the ridge, where the shells have weathered out of old limestone layers. A gravel trail zigzags from the parking lot at the top of the hill down to the fossil bed. Many visitors skip the zigzags and walk straight down the steep slope instead. Their footsteps have worn several bare shortcut paths into the hillside.

2Ranger Dmitri Volkov showed the class what happens next. Where feet crush the plants, rain runs straight down the bare paths and carries soil with it. Small gullies form, and mud washes over the fossil bed and into Ridge Creek below. To monitor the problem, the ranger pushed steel erosion pins into the ground at four places on the same slope last April. When each pin was set, its top stood 5.0 cm above the soil. As soil washes away, more of the pin shows. At each pin, the ranger also recorded plant cover: the percent of a 1 m by 1 m frame that plants covered. All four places got the same rain from April to October.

3This year, the park tested three fixes on three shortcut paths that were about equally steep and equally busy. All three paths are on the same ridge and got the same rain. Path A got no fix. Path B got "Please stay on the trail" signs at the top and bottom. Path C got a sign, a row of logs across its top, and young native plants set into the bare soil. A trail camera counted hikers on each path, and new erosion pins measured the soil lost from May to October.

4The park has set its goals for all six shortcut paths on the ridge. Each path should lose less than 1 cm of soil from May to October, and visitors must still be able to reach the fossil bed by the zigzag trail. The project can spend no more than $11,000 in all.

Table 1. Erosion Pins, April to October
Place on the slopePlant cover (%)Soil lost (cm)
Untouched slope850.2
Slope near a shortcut600.6
Edge of a shortcut301.4
Middle of a shortcut53
1.

In October, how much of the pin in the middle of the shortcut stood above the soil?   cm

The preview shows the first questions. Unlock the worksheet to see all of it.

Related worksheets